This listing identifies a third-party MCP server. MCPBundles is not affiliated with, sponsored by, or endorsed by the service or its operator unless stated on this page.
This server may ask you to sign in when your AI client connects.
Last probed Nov 3, 2026 · planner.monopoly-gold.com
43tools discovered
For AI agents — MCPBundles Directory API
For MCP client apps (human connect):
MCP connect URL: https://planner.monopoly-gold.com/_mcp
Skill page: https://www.mcpbundles.com/skills/planner-mcp-b955da1c6b
Explore capabilities (43)
read 6
write 19
Showing 25 of 43
Showing 25 of 43 tools from the public preview. Connect the server to inspect the full live tool list.
Goal18
Project7
Project List
read
project-list
List all projects with optional status filter (active/archived/paused). Returns id, title, slug, webUrl, icon, and goals_count for each project. Use project-get for full details with goals breakdown by status.
Project List — List all projects with optional status filter (active/archived/paused). Returns id, title, slug, webUrl, icon, and goals_count for each project. Use project-get for full details with goals breakdown by status.
Project Create — Create a new project container for goals. Requires title and a unique slug (lowercase a-z, 0-9, hyphens). Optional: description, status (active/archived/paused, default active), tags, icon (emoji), repositoryPath, repositoryUrl, sourceRef ({type:"git",url,ref} — remote-research source), isDefault. Returns the created project with id, slug, and webUrl. Slug must be unique — duplicates are rejected with existing slugs list.
Project Get — Fetch full project details: title, slug, status, description, icon, tags, repository info, sourceRef ({type,url,ref} for remote-research or null), goals breakdown by status (backlog/in_progress/blocked/done/cancelled counts), and depends_on list of project dependencies.
Project Update — Partial update of a project — only the fields you pass are changed; omitted fields are untouched. Updatable: title, slug, description, status (active/archived/paused), tags, icon (emoji), repositoryPath, repositoryUrl, sourceRef ({type:"git",url,ref} — remote-research source), clearSourceRef (true → сбрасывает Project.sourceRef в null; несовместим с sourceRef), isDefault, redTeamMode (optional/advisory/required), evidenceJudgeMode (off/optional/required), allowedGoalMode (any/grove_only), fmeaGe
Project Delete — Delete a project. If the project has goals, pass force=true to cascade-delete them all; without force, the call is rejected with the goals count. Returns deleted title, slug, and goals_deleted count.
Project Add Dependency — Declare that one project depends on another (depends-on relationship). Accepts UUID or slug for both sides. Idempotent: if the dependency already exists, returns it with already_existed=true. Self-references are rejected. No cycle detection — the caller is responsible for avoiding circular chains.
Project Remove Dependency
Get your MCP into directories
A working endpoint is step one. Directory coverage is the coordinated launch across ChatGPT, Claude, Cursor, the MCP Registry, and community indexes.
Monopoly-gold is an MCP server at planner.monopoly-gold.com. MCPBundles discovered 43 tools on the live endpoint.
How do I connect Monopoly-gold to my AI agent?
Use the MCP endpoint listed on this page in your MCP client configuration. One-click install pills support Claude, Cursor, VS Code, and other hosts. Copy the remote MCP URL if your client needs a manual entry.
How many tools does Monopoly-gold provide?
Operate this server?
Request removal if you do not want Monopoly-gold listed here, or claim the listing if you want to manage it on MCPBundles.
Operate Monopoly-gold?
This server appears in the MCPBundles directory. Verify you operate it to take over the listing — name, description, logo, contact email, and skill content. We email a 6-digit code to a maintainer address your server publishes in /.well-known/security.txt or /.well-known/mcpbundles.json. Free, takes about a minute.
MCPBundles publishes this directory for MCP discovery. Except where we host or operate an offering, third-party services run under their own terms. Product and company names on this page are used in a descriptive, identifying way (including under nominative fair use where applicable); they remain the property of their owners. Nothing here grants you rights in those marks, and nothing here is an offer to sell a third party's services. Terms · Request removal
More in developer tools
Other MCP servers in this category from the directory index
— Remove a project dependency. Two lookup modes: pass dependency_id (UUID of the link itself), or pass both projectId and dependsOnProjectId (UUID or slug). Returns removed=true on success, removed=false if the dependency was not found.
Goal List — List goals with optional filters: projectId (UUID), status (backlog/checking_ac/checking_ac_failed/checking_ac_errored/ready_for_work/in_progress/blocked/done/cancelled), type (goal/milestone/task/habit), parentId (UUID — direct children only). Returns up to limit results (default 50, no offset pagination). Sorted by priority ASC then createdAt DESC. Each entry has id, title, webUrl, status, priority, type, progress, parent_id, project_id.
Goal Create — Create a goal/task/milestone/habit in the planning tree. Two modes: grove (default) — enforces acceptance criteria gate on status transitions (AC required before ready_for_work, file-evidence per AC before done); standard — carries the same AC but without the evidence gate (advisory linting only). Returns the created goal with id, webUrl, mode, and nextStep hint. For an explicit visible UI result, the response may include an advisory visualAcSuggestion; adopt its criterion through goal-add-crite
Goal Get — Fetch full details of a single goal: title, description, status, priority, type, mode, children, acceptance criteria (with evidence coverage), blockers, tags, deadline, estimate, history log, and project. The primary drill-down tool after goal-list or goal-tree. For a Planner goal URL, do not browse the UI: extract the UUID after /goal/ and pass it as required goalId.
Goal Update — Partial update of a goal — only the fields you pass are changed; omitted fields are untouched. Updatable: title, status, priority (1-5), description, type, tags, deadline, estimate, mode, attemptCommit (git SHA of the attempt commit; once a deployed revision contains it, post-deploy probes of this goal run automatically and record machine verdicts — pass "" to clear), dismissVisualAcSuggestion. Status transitions follow a matrix: backlog→ready_for_work (author; grove: requires ≥1 AC, red-team ch
Goal Delete — IRREVERSIBLY delete a goal and all its descendants (children, evidence, blockers). Prefer goal-update status=cancelled to preserve history, or goal-block to mark an obstacle. Use delete only for erroneous/duplicate entries. Returns the deleted title and children_deleted count.
Goal Move — Move a goal to a different parent or project. Pass newParentId=UUID to reparent (inherits project from new parent), newParentId=null to make root. Optional projectId=UUID overrides the target project when making root (cross-project move to root). Cascades project change to all descendants. Prevents cycles.
Goal Reorder — Set display order of sibling goals within the same parent and priority band. Pass an array of goal UUIDs in the desired order — each is assigned position = its array index. All goals must share the same parent and priority.
Goal Block — Add a blocker to a goal (blockers are additive — each call appends a new one, existing blockers are preserved). Sets status to blocked. Optionally create an inline resolver goal (resolverTitle) or link an existing one (linkedGoalId) — mutually exclusive. When the last active blocker is removed via goal-remove-blocker, the goal returns to its previous status.
Goal Remove Blocker — Remove a blocker from a goal by blocker UUID. If it was the last active blocker, the goal automatically returns to its previous status (in_progress or backlog). Does not delete the linked resolver goal if one exists.
Goal Todo — Quick-capture a task or improvement idea into a project. Creates a backlog task with priority 4 (low) and auto-adds the "suggestion" tag. Resolves project by slug (falls back to the default project). Lightweight alternative to goal-create when you need minimal ceremony.
Goal Add Note — Add a free-form note (markdown supported) to a goal — decisions taken, dead ends hit, context worth carrying into the next session. Notes are NOT evidence: they hang off the goal rather than an acceptance criterion and never count toward AC coverage or closing a Grove goal — use goal-attach-evidence for proof. Notes are visible in the goal detail panel and returned by goal-get under notes[].
Goal Remove Note — Remove a note from a goal by note UUID. Note ids come from goal-get (notes[].id). Deletes only the note — never touches acceptance criteria, evidence or blockers.
Goal Tree — Fetch the full goal hierarchy as a nested tree. Optional filters: projectId (UUID) to scope to one project, rootId (UUID) to get a subtree. Each node includes id, title, status, priority, type, progress, and nested children array.
Goal Summary — Aggregate statistics across all goals (or scoped to a projectId): total count, breakdown by status, root count, blocked count, and overdue count. Useful for daily standups and dashboard views.
Goal Add Criterion — Append an acceptance criterion to a goal. The text must describe an observable check over an artifact (e.g. "GET /api/health returns 200 with {status:ok}"), not a subjective approval. Each criterion has a class: pre-merge (default — proved in CI / by attached evidence) or post-deploy (proved by an executable probe against the deployed prod instance). A post-deploy criterion MUST carry probeSpec {method, url, expect:{http_code, body:{field: expectedValue}}} — the request the runner sends and the
Goal Update Criterion — Update an acceptance criterion: its text and/or its class + probe. probeClass=post-deploy requires an executable probeSpec {method, url, expect:{http_code, body}} (kept from the criterion when omitted and one already exists; otherwise error=probe_required); probeSpec alone implies post-deploy; probeClass=pre-merge drops the probe. Grove mode: only while goal is in backlog (frozen once started), quality linter blocks high-severity issues. Standard mode: until goal is done, linter is advisory. Ret
Goal Remove Criterion — Remove an acceptance criterion from a goal. Grove mode: only while goal is in backlog (frozen once started). Standard mode: until goal is done. Cascades to all evidence on the criterion. Returns confirmation with removed criterion details.
Goal Attach Evidence — PRIMARY path to close a Grove goal: this is the ONLY tool that covers an acceptance criterion. Attach binary evidence (screenshot, log dump, API response, export) to an AC — call it once per criterion to satisfy the close gate. The subordinate goal-add-evidence-text only adds context for proofs with NO bytes (URLs to permanent external sources, manual repro descriptions) and does NOT cover an AC. Caption is optional but strongly recommended: state what the file captures and the reproduction cond
Showing the first 25 tools — full list and schemas: Directory API.
MCPBundles probed 43 tools on the live server. The tool list on this page reflects what was discovered at the last refresh — connect your client to see the full set available to your session.
What authentication does Monopoly-gold require?
Monopoly-gold may require signing in to the provider before tools can run. Connect through MCPBundles or your MCP client and complete any provider login when prompted.
Don't want this listed?
Request removal from the MCPBundles directory. We stop publishing this listing on mcpbundles.com.
MCPBundles is an independent platform built on the open Model Context Protocol standard. MCPBundles is not affiliated with, sponsored by, or endorsed by Anthropic PBC.